The Ceva Logistics Warehouse project marks a significant milestone for S4i, our first warehouse integration delivered in collaboration with Modcol. The project showcases how S4i’s Integration Broker (IB) platform can bridge modern wireless lighting control with established wired control systems, delivering a scalable, energy-efficient solution for large industrial environments.
S4i worked closely with Modcol, Eltad, and La Luce to deliver a fully integrated lighting and control system tailored to the operational demands of a high-performance logistics facility.
Project Overview
The warehouse lighting system was designed around Casambi wireless control, integrated seamlessly into a Dynalite backbone for local switching and global scheduling. This hybrid approach enabled modern, flexible control without disrupting existing infrastructure or requiring costly protocol conversions.
The solution provides centralised control, real-time responsiveness, and long-term scalability — all while significantly reducing installation complexity and commissioning time.

What S4i Delivered
Network & Control Architecture
• Complete network design and architecture
• S4i Integration Broker (IB) Host
• 9 × S4i USB Casambi Gateways
• S4i Ethernet-to-USB Extenders
Lighting & Control Integration
• Casambi-enabled highbay luminaires supplied by La Luce
• Motion and daylight sensors for automated, energy-efficient operation
• Wireless Casambi mesh networks integrated into a Dynalite backbone
• Centralised scheduling and control via S4i IB software
Commissioning
• System commissioned by Modcol
• Accelerated commissioning process using S4i’s cloud-free, code-free IB platform

System Capabilities
• Integrated motion detection and daylight harvesting to reduce energy consumption
• Flexible control options including scene, preset, group, and individual luminaire control
• Local wall switch operation via Dynalite, combined with global scheduling and automation
• Seamless wireless integration using CasambiCBM-003 chipsets
• No reliance on cloud services or custom code
Warehouse Specifications
• Warehouse Area: 31,500 m²
• Luminaires: 491 Casambi-enabled highbay fittings
• Casambi Networks: 5 independent mesh networks

Key Savings & Outcomes
• Reduced cabling infrastructure, resulting in faster installation
• 50% reduction in commissioning time
• 2 weeks versus the typical 4 weeks on comparable projects
• Lower ongoing maintenance and operational costs
• Improved sustainability performance through reduced energy consumption
• Future-ready platform that supports expansion and system upgrades
This project demonstrates how S4i’s Integration Broker enables practical, real-world interoperability — combining wireless lighting control with existing control backbones to deliver measurable cost, time, and energy savings.
The Ceva Logistics Warehouse sets a new benchmark for smart, scalable, and efficient warehouse lighting integration, and establishes a proven model for future industrial projects delivered with Modcol and S4i.